PEOPLE I ENGINEERING I ENVIRONMENTSENGNEERINGNOTICE OF STUDY COMMENCEMENTCLASS ENVIRONMENTAL ASSESSMENTPROPOSED INTERSECTION AT HIGHWAY 4 & PROPOSED MUNICIPAL ROADCOMMUNITY OF HENSALL MUNICIPALITY OF BLUEWATER, HURON COUNTYTHE PROJEGM BluePlan Engineering Limited has been retained by the proponent, Hensall District Co-operative Inc. (HDC), toundertake a Class Environmental Assessment (Class EA) for a new intersection connecting Highway 4 to a proposedmunicipal access road (cul-de-sac) to help reduce existing traffic congestion and support proposed site expansion andgrowth at HDC's head operations complex in the community of Hensall. The project limits are located within theMunicipality of Bluewater and the Municipality of Huron East, within the County of Huron. This study essentiallyrepresents an update to the Group C Class EA completed by URS Canada Inc. in December 2008 on behalf of anadjacent owner, Greenfield EthanolMUNICIPAMUNICIPALITYOFHURON EASTOFThis study is subject to the Ontario EnvironmentalAssessment Act and will follow the approvedplanning process for a Group 'B' project under theClass Environmental Assessment for ProvincialTransportation Facilities (2000). A TransportationEnvironmental Study Report (TESR) whichdocuments the anticipated environmental effects ofthe project and the corresponding ways ofaddressing potential environmental effects will beprepared and made available for public review atthe completion of the studyanordBLUEWATERSTUDY AREThe Ontario Ministry of Transportation will beconsulted throughout the study, and the public willbe offered the opportunity to comment and provideinput to the project team. Notification, advising ofthe time and location of any Public ConsultationCentres will be provided in advance. Following thestudy completion, a 30-day public review period willbe made availableNTSInformation regarding this project is being collected to assist in meeting the requirements of the EnvironmentalAssessment Act, and we invite the public to participate by encouraging the submission of comments to theundersigned. This material will be maintained on file for use during the project and may be included in projectdocumentation. With the exception of personal information, all comments will become part of the public record.For further information, or to be added to the mailing list, please contact:Mr. John C. Kerr, P. EngSr. Project Manager, PartnerGM BluePlan Engineering Limited975 Wallace Ave N, Listowel, ON N4W 1M6Email: john.kerr@gmblueplan.caTel: (519) 291-9339 x3225Fax: (519) 291-5172GUELPHI OWEN SOUND I LISTOWEL I KITCHENER I LONDONI HAMILTON GTA975 WALLACE AVENUE NORTH, LISTOWEL ON N4W 1M6 P: 519-291-9339 F:519-291-5172 wWW.GMBLUEPLAN.CA

Date: July 12, 2017

Expired Ad

This ad expired on
July 19, 2017 (6 days ago)
more_vert

GM Blue PLan

Education / Professional and Management Development

Call
Call 519-291-9339
Directions
Get directions to this
location on Google Maps.
Website
Open website
in new tab.

Text

PEOPLE I ENGINEERING I ENVIRONMENTS ENGNEERING NOTICE OF STUDY COMMENCEMENT CLASS ENVIRONMENTAL ASSESSMENT PROPOSED INTERSECTION AT HIGHWAY 4 & PROPOSED MUNICIPAL ROAD COMMUNITY OF HENSALL MUNICIPALITY OF BLUEWATER, HURON COUNTY THE PROJE GM BluePlan Engineering Limited has been retained by the proponent, Hensall District Co-operative Inc. (HDC), to undertake a Class Environmental Assessment (Class EA) for a new intersection connecting Highway 4 to a proposed municipal access road (cul-de-sac) to help reduce existing traffic congestion and support proposed site expansion and growth at HDC's head operations complex in the community of Hensall. The project limits are located within the Municipality of Bluewater and the Municipality of Huron East, within the County of Huron. This study essentially represents an update to the Group C Class EA completed by URS Canada Inc. in December 2008 on behalf of an adjacent owner, Greenfield Ethanol MUNICIPA MUNICIPALITY OF HURON EAST OF This study is subject to the Ontario Environmental Assessment Act and will follow the approved planning process for a Group 'B' project under the Class Environmental Assessment for Provincial Transportation Facilities (2000). A Transportation Environmental Study Report (TESR) which documents the anticipated environmental effects of the project and the corresponding ways of addressing potential environmental effects will be prepared and made available for public review at the completion of the study anordBLUEWATER STUDY ARE The Ontario Ministry of Transportation will be consulted throughout the study, and the public will be offered the opportunity to comment and provide input to the project team. Notification, advising of the time and location of any Public Consultation Centres will be provided in advance. Following the study completion, a 30-day public review period will be made available NTS Information regarding this project is being collected to assist in meeting the requirements of the Environmental Assessment Act, and we invite the public to participate by encouraging the submission of comments to the undersigned. This material will be maintained on file for use during the project and may be included in project documentation. With the exception of personal information, all comments will become part of the public record. For further information, or to be added to the mailing list, please contact: Mr. John C. Kerr, P. Eng Sr. Project Manager, Partner GM BluePlan Engineering Limited 975 Wallace Ave N, Listowel, ON N4W 1M6 Email: john.kerr@gmblueplan.ca Tel: (519) 291-9339 x3225 Fax: (519) 291-5172 GUELPHI OWEN SOUND I LISTOWEL I KITCHENER I LONDONI HAMILTON GTA 975 WALLACE AVENUE NORTH, LISTOWEL ON N4W 1M6 P: 519-291-9339 F:519-291-5172 wWW.GMBLUEPLAN.CA

Other Ads

codeEmbed

Ads Widget

close

Widget URL

Embed Code

Embed these ads anywhere HTML code is accepted by pasting the snippet below.